The rigid-flex board industry is moving towards green development
Organize research on the technological development direction of the latest products in the industry, and participate in formulating strategic plans for technological development; The rigid-flex board industry is moving towards green development.

Conduct analysis around identified market issues and supplier situations, matching new products, technologies, systems, and other suppliers with new equipment;
Responsible for providing examples and frameworks provided by suppliers, continuously completing supplier design solutions, coordinating research and development, technology, and products;
Responsible for conducting product component performance, parameters, prices, operations, and detailed analysis based on material suppliers;
Ensure the accuracy and requirements of material selection for the company's production line, and require the automation of processes in all parts;
Have good team coordination, procurement ability, work attitude, team management ability, and strong adaptability.
Bachelor's degree or above, with at least 4 years of work experience in semiconductor, optoelectronic semiconductor, or computer related industries;
Have strong customer communication, analysis, and management skills, and track the understanding of electronic components, project progress, and ability throughout the process;
● More than 3 years of experience in analog and digital analog hybrid integrated circuit design (with product, platform and scheme R&D capabilities);
● Introduce Psp and Cadence or other digital analog hybrid software based on necessary planning and circuit foundations;
Multiple and intelligent management methods can be adopted to effectively control product quality issues and improve the qualification rate of enterprise products.
Adopting self-designed software, it can flexibly adapt to different needs of work, greatly reducing the burden of testing on personnel.
The professional technical management process, in conjunction with our MES/ERP sales representatives, can provide product technical support and training, greatly improving customer competitiveness.
Regularly conduct industrial testing and test product structure (non-standard products, based on safety regulations as the standard, regularly test products).
Provide ESD testing reports, develop correct testing methods for customer products, and provide timely feedback to customers.
Regularly incentivize the contracting team to generate about 20% of the flush printed board for Chongzuo City export.
Place the capacitance values of the upper/lower measuring elements close to the resistance warehouse, and connect the temperature sensor circuit close to the signal amplification board.
After inspecting and repairing computers, office electronic equipment, etc., it is generally not allowed to leave the workplace for a long time to prevent serious CPU failure.
Replace the signal board. Some computers are wired, some are wired, but most of them are connected to computers on the computer end. The computer should have a core to check if there is a circuit board on the computer.
Before installing the distribution board, it can be powered on after testing normally. The interface and interface are not in contact, and the connecting wires cannot be threaded.
Do not place it on heating elements and circuit boards before and after power on. After the circuit is operating normally, place the circuit board upside down as much as possible.

Conduct analysis around identified market issues and supplier situations, matching new products, technologies, systems, and other suppliers with new equipment;
Responsible for providing examples and frameworks provided by suppliers, continuously completing supplier design solutions, coordinating research and development, technology, and products;
Responsible for conducting product component performance, parameters, prices, operations, and detailed analysis based on material suppliers;
Ensure the accuracy and requirements of material selection for the company's production line, and require the automation of processes in all parts;
Have good team coordination, procurement ability, work attitude, team management ability, and strong adaptability.
Bachelor's degree or above, with at least 4 years of work experience in semiconductor, optoelectronic semiconductor, or computer related industries;
Have strong customer communication, analysis, and management skills, and track the understanding of electronic components, project progress, and ability throughout the process;
● More than 3 years of experience in analog and digital analog hybrid integrated circuit design (with product, platform and scheme R&D capabilities);
● Introduce Psp and Cadence or other digital analog hybrid software based on necessary planning and circuit foundations;
Multiple and intelligent management methods can be adopted to effectively control product quality issues and improve the qualification rate of enterprise products.
Adopting self-designed software, it can flexibly adapt to different needs of work, greatly reducing the burden of testing on personnel.
The professional technical management process, in conjunction with our MES/ERP sales representatives, can provide product technical support and training, greatly improving customer competitiveness.
Regularly conduct industrial testing and test product structure (non-standard products, based on safety regulations as the standard, regularly test products).
Provide ESD testing reports, develop correct testing methods for customer products, and provide timely feedback to customers.
Regularly incentivize the contracting team to generate about 20% of the flush printed board for Chongzuo City export.
Place the capacitance values of the upper/lower measuring elements close to the resistance warehouse, and connect the temperature sensor circuit close to the signal amplification board.
After inspecting and repairing computers, office electronic equipment, etc., it is generally not allowed to leave the workplace for a long time to prevent serious CPU failure.
Replace the signal board. Some computers are wired, some are wired, but most of them are connected to computers on the computer end. The computer should have a core to check if there is a circuit board on the computer.
Before installing the distribution board, it can be powered on after testing normally. The interface and interface are not in contact, and the connecting wires cannot be threaded.
Do not place it on heating elements and circuit boards before and after power on. After the circuit is operating normally, place the circuit board upside down as much as possible.
RELATED NEWS
PCB Manufacturing and Assembly in China
Contact Us
pcb board manufacturing How To Contact US
PCB from 1 to 30 layers, HDI, Heavy Copper, Rigid-flex board with "pcb board manufacturing One-Stop" service.